Monday 23 February 2009

Roof on and floor sections complete

The pictures are a little out of order here - this is the side view of the house.  Planning wouldnt allow us too much in teh way of windows, so there is a side entrance and window, then two smaller windows on the first floor which have to be obscure glass.


This is the living area, the hole in the wall is the fireplace, and we have opted for some wide casement style windows on the front of the house, you can see the where the windows will eventually go.



This is the view from the front - the roof is complete, the floors are now in, and the roofer is finishing the cover and battening so we can hopefully have a dry house, or at least from the top down.  The mild weather the last couple of weeks has been really great, and allowed us to crack on after all the snow that was slowing things down.

Here you can see the storage area at the top of the house.  We opted for creating a room rather than rafters and loft, the pile of wood in the front of the photo is the frame for the staircase, which will go in once the floor is complete.


and the back view, the rear windows have taken shape, and with the roof now battened the project seems to be moving on fairly quickly.  





This is the inside just showing the rear living/kitchen area, the entrance to the left is going to be double doors and windows, the hole in the wall to the right is a second fireplace, and in the middle a further window.