Saturday 21 March 2009

Whilst it all seems a bit slow day by day, all the little internal and external jobs are moving on. 

The insulation for the walls was delivered this week, so we have lots of different style of insulation all over the ground floor, and once the first fixes are done, then in it goes!



This is the Kingspan insulation panels for the outside facing walls


..and the plumbers have been in doing their first fix as well.  For the first time we needed accurate locations of all the sinks, taps, waste and shower units so that the piping could be run through the floors.  I was a little concerned over the holes they drill to run the pipes, but once the insulation is in place, hopefully the noise will stay to a minimum.  Here you can see the pipes to the utility room sink (hope we dont decide to move it!) and in the distance the radiator pipes.

We had not really put a lot of thought into the radiator positioning, so we have gone with the recommendations of the heating engineers, and for the most part put them under the windows.  

The size of each radiator varies, and according to the room size, as to what size or how many panels the radiator has.  Because we have underfloor heating downstairs we only have the upstairs to worry about for now.

All the Radiator pipes are run as plastic click and fit, but when they exit out of the walls, then they are copper fittings, so they look nice.


Here you can see the pipe runs through the ceiling