Sunday 3 May 2009

The wiring is nearing the end of its first fix, and finally all the strands are coming together down by the consumer box.  You can see the large black armoured cable which is for outside, the rest are the electric cables from around the house - and yet to join the mix is a pile of cat6 cables, so a fair bundle of cables to sort out.

All  the first fix plumbing is now complete, and next step will be the underfloor heating for the ground floor.




The bricks are coming along, now the first level is complete, but with all the scaffolding and polythene protecting everything its really difficult to get an impression of how it will look, but so far it looks great and we are pleased with the choice of bricks.




No comments:

Post a Comment